Site Mapping Guide
Introduction
Welcome to SiteMapping.Guide, an online guidance for the production of site maps in humanitarian response. Site maps are a key resource at all stages of a camp lifecycle; from the site planning of empty or partially settled land; the coordination and management of services on a site; the development and improvement of a sites’ infrastructure; to the site closure/handover/decommissioning stage.
The aim of this guidance is fourfold:
Broaden the development of site maps to more humanitarian actors and profiles, mainstreaming the skills required and reducing reliance on a limited pool of specialized profiles.
Increase the speed at which site maps are developed. The shorter the lead time for creating site maps, the more useful they are for planning activities and coordinating partners in site, especially in sudden onset contexts.
Scale the availability of site maps to increase their benefit to reponses in a wider number of sites as well as in a wider number of countries.
Encourage the creation of consistent site map products, in terms of visuals, quality and process that are affected population-centric and that adhere to data responsibility and safeguarding standards.
The Site Mapping Guide provides a full step-by-step workflow to develop site maps. It also outlines key considerations and data protection risks associated with the management of drone captured imagery, as well as the responsible dissemination of related information products produced in the process.
This guide presents two different approaches to developing site maps. The first approach uses existing satellite imagery and the second uses drones to capture aerial imagery of sites when and where satellite imagery is not available or not suitable.
What is a Site Map?
While no strict definition of a site map exists, this guidance considers site maps to be physical or electronic maps of IDP displacement sites that use imagery (aerial or satellite), along with the tracing and labelling of infrastructure (current or planned) as a tool for planning, coordination and risk analysis.
Infographics or maps that present the needs or activity/output-level indicators are, for the purpose of this document, considered as Site Profiles rather than Site Maps and are beyond the scope of this guide.
Audience
This guide is for any Camp Coordination Camp Management, Shelter, WASH or assessment actor, working in humanitarian contexts, requiring site maps to do site planning, camp coordination or risk analysis and working at either agency or inter-agency level.
While some prior knowledge of GIS software is beneficial for those who plan to use this guide, it is not a prerequisite. We hope that the steps documented in the below chapters are sufficient in detail and clarity for first-time users and will accompany new and experienced site mappers through the process of making site maps, from digitising, creating and visualising spatial data to exporting and disseminating standardized site maps. Learning materials and training resources for first-time GIS users can be found here.
While the guidance is relevant for all humanitarian staff, sections that are specifc to IOM can be found in blue boxes like the following:
Sections in the guidance that are specific to IOM staff will appear in boxes like this.
When and how to use site maps
Site maps can illustrate camp and camp-like settings in both sudden-onset disasters as well as protracted emergencies. Site maps are relevant throughout the camp lifecycle and support the set-up, care and maintenance, closure and post-closure or recovery stages of a site by being used to support the following activities:
Site planning during sudden-onset emergencies or protracted crises.
Site improvements where site maps can be used to design and plan improvements to site infrastructure and layout for disability and inclusion, GBV and fire hazard risk mitigation.
Site-level camp coordination amongst service providers and ensuring coordination in the establishment of essential site infrastructure and camp services.
CCCM coordination at the Cluster-level.
GBV/ Protection Safety Audits conducted through direct observation, key informant interviews, focus group discussions.
Acknowledgments
This guide was developed by International Organisation for Migration in 2022 and 2023, with considerable inputs, support and feedback from experts in fields such as site planning, GIS, CCCM, GBV and WASH. Financial support for this guide was generously provided by the United States Department of State’s Bureau of Population, Refugees, and Migration (BPRM) through the Safe From the Start Initiative. This guide was compiled by Brian Mc Donald and Manon Jones from IOM HQ Global CCCM with feedback and inputs from Wan Sophonpanich, Amina Saoudi, Patricia Ocana, Amalia Torres, Jennifer Kvernmo, Louise Mary O Shea, Agnes Kwoba Olusese, Agnes Tillinac, Andrea Cippa (SDC), Jim Kennedy, Jessica Mamo (IOM), Joseph Ashmore (IOM), and Baudoin Luce (IOM).
Feedback
Many of the approaches and software/hardware tools are quickly evolving and improving. As such, we consider this guide to be a living document. If you have any suggestions on how we can improve this guide, please reach out to majones@iom.int and bmcdonald@iom.int.